|
详细内容:
|
公告公告标题:Onshore Diesel Purchase for Pasay Reclamation Development Project Tender Notice公告内容:
Conditions
Onshore diesel purchase for this Project has met the tender conditions and now is open for public tender, adopting electronic/offline tendering and bidding methods.
Content
Package NO.
Product
Type
Delivery place
Quantity(L)
Note
1
Diesel
ULSD
Pasay Reclamation Development Project, Pasay City, Metro Manila
200,000.00
In Total
200,000.00
Remark:
1. The daily diesel consumption for CHEC Pasay Reclamation Project Site is around 3000 -6000 liters, transportation for delivery is only considered by oil tank truck.
2. Oil tank truck shall carry powerful fuel gun with capacity over 50 liters/minute.
3. Diesel quality report shall be provided to the buyer before each delivery.
4. Quantity with 200000 liters is to be supplied in total, supplier is requested to provide agreed quantity like 3000 -6000liters daily to CHEC project Site.
5. Diesel supplied shall be in full compliance with below specification (Philippine National Standard):
PROPERTIES
TEST METHOD
PNS/DOE
QS 015: 2021
DENSITY @ 15°C kg/L
ASTM D 4052
0.820-0.860
COLOR, ASTM
ASTM D 1500
2.5 max.
SULFUR CONTENT, %
ASTM D 5453
0.0050 max
FLASH POINT, PMCC°C
ASTM D 93
55℃
KINEMATIC VISCOSITY @ 40°C, mm2/s
ASTM D 445
2.0-4.5
DISTILLATION 95% Recovered °C
ASTM D 86
360 max.
CETANE INDEX
ASTM D 976
50 min.
COPPER STRIP CORROSION 3H @ 50°C
ASTM D 130
No.1
WATER AND SEDIMENT, % vol
ASTM D 2709
0.1 max
WATER CONTENT, % vol
ASTM E203
0.05
METHYL LAURATE (C12ME), % mass
PNS EN 14103 modified
0.80 min.
FAME CONTENT, % vol.
PNS EN 14078 modified
2.7-3.2
ASH CONTENT, %wt
ASTM D482-13
0.01 max
Requirements for Bidders
3.1 Bidders must be legally registered and possess a full set of company permits such as SEC, Business Permit, Certificate of Registration (BIR), General Information Sheet and other relevant Certificates as required by laws and regulations.
3.2 Bidders shall provide the proof of possessing the fuel resources and have the capability to supply diesel.
3.3 The supplier has sufficient cash terms: After the goods arrive at the site and pass the acceptance inspection, the seller shall provide the monthly bill by the end of the month. The payment of 100% of the current batch of goods shall be made within 30 days after both parties sign and confirm the bill..
3.4 Bidders must not fall under any of the following circumstances:
(1) The same person serves as the legal representative of multiple bidders or there exists a controlling or management relationship between different bidders. In such cases, bidding for the same section is not allowed, otherwise, all related bids will be invalid.
(2) Bidders whose bidding qualifications have been suspended or canceled.
(3) Bidders whose production or business operations have been ordered to be suspended, or whose licenses or permits have been suspended or revoked.
(4) Bidders who are undergoing liquidation procedures, have been declared bankrupt, or have other circumstances that result in a loss of performance capabilities.
(5) Bidders who has been included in the list of serious illegal and dishonest enterprises.
4. Bid Bond
None.
of Tender Documents
5.1 Interested bidders shall register as a supplier or apply to add a cooperative intention unit on the "CCCC Supply Chain Management Information System" (website:
5.2 Please download the tender documents from the "CCCC Supply Chain Management Information System" (website: from 12:00 on 27 April ,2026 to 17:00 on 02May , 2026 .Or contact the tenderer to obtain the tender documents.(address:4966 Enrique Street, Brgy. Palanan, Makati City,Philippines 09603311305,cheng)
of Bid Documents
Email address.:flb@
Or Mail the tender documents.(address:4966 Enrique Street, Brgy. Palanan, Makati City,Philippines 09603311305,cheng)
Method
email address:flb@
Information
For other bidding matters related to this project, please contact the business contact person, and for specific on-site project information and inquiries, please contact the project contact person.
Tenderer: Pasay Reclamation Development Project,
China Harbour Engineering Company.
Contact Person: CHENG BIN
Phone: 09603311305
Email: chengbin5@
Date: 26 April, 2026
附件列表 序号附件名称附件说明操作 物资信息 序号设备物资名称设备物资说明税率单位 1 普通柴油 0 0% 升 验证码验证码取消确定 列表 序号公告类型公告名称环节
|